Run-to-failure maintenance

The real cost of run-to-failure maintenance in schools

Fixing things when they break looks cheaper because nothing is spent until something fails. The cost is still there. It just arrives later, at a worse time, and often with a bigger bill.

  • For K-12 school districts
  • About 4 min read

In short

  • The US Department of Energy reports that more than 55% of maintenance at an average facility is still reactive.
  • It estimates 12% to 18% savings for a preventive program over a reactive one.
  • In schools the hidden costs include cancelled classes and events, which no budget line shows.

What run-to-failure means

Run-to-failure, also called reactive maintenance, means waiting until equipment breaks and then fixing it. For cheap equipment that nothing depends on, that can be a sensible choice. For a boiler, a rooftop unit, a roof or a fire alarm panel, it rarely is.

The US Department of Energy's Operations & Maintenance Best Practices guide reports that more than 55% of maintenance resources and activities at an average facility are still reactive. Top-performing facilities, it says, are under 10% reactive.

Where the money goes when things break

  • Emergency labor. Breakdowns after hours and on weekends mean call-outs and overtime instead of planned visits.
  • Rush parts and contractors. When a system is down, you pay for speed.
  • Secondary damage. A failed pump or a blocked drain can damage ceilings, floors and the systems around it.
  • Shorter equipment life. Equipment that is never serviced tends to wear out sooner.
  • Lost planned work. Every emergency pulls staff away from the upkeep that would prevent the next one.

The guide estimates that a preventive program saves 12% to 18% compared with a reactive program. That is a broad estimate for facilities of every kind, not a promise for any one school, but it shows the size of the gap.

The cost no budget line shows

When a school's heating fails in January, classes move or students go home. When the gym's air handler quits before a tournament, the event is cancelled. These costs land on teachers, families and the community, not on the maintenance budget, and they are the ones a board hears about.

We don't put a dollar figure on them, because no reliable published figure exists. Read more in counting what you avoid.

Why schools drift into run-to-failure

Few districts choose run-to-failure on purpose. It creeps in. A tight budget year postpones a service contract. A retiring technician takes the upkeep schedule with them. A run of emergencies uses up the hours that were meant for planned work, and next month there are more emergencies because the planned work didn't happen.

Breaking the cycle doesn't need a big launch. It needs a short list of critical equipment, a schedule that people can see, and a way to tell whether the share of planned work is going up. Start with a few systems, keep them on schedule for a season, and add more once that is routine.

Skipped upkeep also piles up as deferred maintenance. The deferred maintenance calculator shows how that backlog can grow when funding stays flat.

How to move away from run-to-failure

  1. Measure your reactive shareOver a year, compare spend or hours on repairs and emergencies with spend or hours on scheduled upkeep.
  2. Start with critical equipmentHeating, cooling, fire and life safety, roofs and drains.
  3. Write simple plansClear tasks, how often, and a named owner for each.
  4. Review monthlyWatch the reactive share fall, and plan replacements for equipment that keeps failing.

For equipment that keeps failing, the repair or replace calculator compares another repair with a new unit.

See what that shift could be worth with the preventive maintenance savings calculator or the school maintenance savings estimator. In myFacilities, preventive maintenance scheduling creates the work on time, work orders record every repair against its asset, and QR asset tags let a technician open the right record in one scan.

Questions districts ask us

Short answers about reactive maintenance.

What is run-to-failure maintenance?

Waiting until equipment breaks and then fixing it, instead of servicing it on a schedule. It is also called reactive maintenance.

How much maintenance is reactive at a typical facility?

The US Department of Energy's guide reports that more than 55% of maintenance at an average facility is still reactive, and that top-performing facilities are under 10%.

How much can preventive maintenance save?

The same guide estimates 12% to 18% savings over a reactive program. Treat it as a broad estimate; your own records give the best answer.

Why do schools end up with so much reactive work?

Tight budgets, staff turnover and a run of emergencies all push planned work aside, and skipped upkeep leads to more emergencies.

Is run-to-failure ever the right choice?

For cheap equipment that nothing depends on, it can be. For systems that would close a classroom, planned upkeep is usually the better choice.

What does myFacilities cost?

Contact us for pricing.

Keep reading

Tools and plain-language guides for school facilities teams.

Explore the product: Work Order Management · Facility Asset Management · SMART™ capital planning · K-12 Education

Fewer emergencies, more of a plan.

If you would like to see how myFacilities schedules preventive maintenance and tracks every repair, we are happy to show you.