For facilities leaders
How to present a maintenance savings case to your school board
Boards are asked to trust a lot of projections. The maintenance savings case that lands is the one built from the district's own numbers, shown as a range, and honest about what it doesn't know.
In short
- Gather your own spend, your reactive share and your asset data before you open any calculator.
- Show a range built from a named source, not a single number.
- Say what is not counted, and how you will measure progress.
What a school board wants to know
Board members want three things: what problem this solves, what it is likely to be worth, and how they will know it worked. They are wary of round numbers and confident promises, and they remember projections that didn't come true.
So the strongest savings case isn't the biggest number. It is the most believable one.
The numbers to gather first
- Your maintenance and repair spend. Separate it from custodial, utilities and insurance if you can. If you can't, a published share can stand in: in Washington State's 2024-25 statewide figures, maintenance was 18.1% of maintenance and operations spending.
- Your reactive share. From work orders, how much of the spend or hours went to repairs and emergencies rather than scheduled upkeep.
- A national comparison. NCES reports $1,581 per student for operation and maintenance in 2022-23, a useful check on your total.
- Your problem equipment. The systems that failed most, cost most, or closed classrooms last year.
Two more numbers help set the scene: your facility condition index, from the FCI calculator, and where your deferred maintenance is heading, from the deferred maintenance calculator.
Show a range, and name its source
The US Department of Energy's Operations & Maintenance Best Practices guide estimates that a preventive program saves 12% to 18% compared with a reactive one. Apply that range only to the maintenance and repair work you plan to move from reactive to planned (your maintenance spend × today's reactive share minus your target share), not your whole operations budget, and present both ends.
A range does two jobs. It is honest about uncertainty, and it gives the board a low end you are confident about. The school maintenance savings estimator and the preventive maintenance savings calculator both show their working, so you can put the math on a slide.
A simple structure for the presentation
- The problem, in examplesTwo or three recent failures: what broke, what it cost and who it affected.
- Where you are todayYour reactive share, your most expensive equipment and the buildings in the worst condition.
- The estimateThe savings range, the formula and the source, on one slide.
- The planWhat changes in how the team works, starting with which equipment.
- How you will reportThe measures you will bring back, and when.
What not to promise
- No single number. One figure sounds like a promise.
- No savings on things it doesn't touch. A maintenance program doesn't lower insurance or most utility costs.
- No instant results. Moving work from reactive to planned takes time, and savings build over years.
- No dollar value for avoided disruption. Describe cancelled classes and events in words; no reliable published figure prices them.
Then say how you will report progress: the reactive share each quarter, overdue preventive maintenance, and the condition of your worst buildings. In myFacilities, work orders and preventive maintenance scheduling give you those numbers, iFCA™ inspections give every building a condition score, and SMART™ Forecasting produces a multi-year capital plan the board can follow.
Questions districts ask us
Short answers for facilities leaders preparing a board presentation.
What figures should a maintenance savings case include?
Your maintenance and repair spend, your share of reactive work, a savings range with its source named, and how you will measure progress.
Why show a range instead of one number?
Because the published estimate is a range, 12% to 18% from the US Department of Energy, and because a range with a confident low end is easier for a board to trust.
Should savings be applied to the whole operations budget?
No. Apply them only to the maintenance and repair work that moves from reactive to planned. The rest of the budget, such as custodians, utilities and insurance, is not what a maintenance program changes.
How long should the presentation be?
Short. A handful of slides covering the problem, where you are today, the estimate with its source, the plan and how you will report back is usually enough.
How do we report progress after approval?
Track the reactive share of work, overdue preventive maintenance and building condition scores, and report them on a regular schedule.
What does myFacilities cost?
Contact us for pricing.
Keep reading
Tools and plain-language guides for school facilities teams.
Explore the product: Work Order Management · Facility Asset Management · SMART™ capital planning · K-12 Education
Build the case from your own records.
If you would like help putting your district's numbers together, we are happy to walk through them with you.