Estimate maintenance savings from your schools, students or square feet

Start from your number of schools, students or square feet. We estimate your maintenance spend from published federal and state figures and show the yearly savings from moving work from reactive to planned, step by step.

  • Free, no sign-up
  • Nothing is saved

Estimate your maintenance savings

Pick one way to describe your district. We estimate its yearly operation and maintenance spend from U.S. averages, take the maintenance and repair part, and apply the Department of Energy's savings range to the work you move from reactive to planned. Every figure can be changed. Dollar signs and commas are fine.

For other types of buildings, use the preventive maintenance savings calculator, with presets for other types of organization.

Start from
For example 10. We turn it into students using about 492 students per school, our calculation from NCES.
Example figure: Washington State's maintenance and repair share (2024-25). Operation and maintenance spending also covers custodians, utilities and insurance; the savings apply only to maintenance and repair. Change it to fit your district.
Rule of thumb from the DOE guide: the average facility is more than 55% reactive. Change it to your own.
A gentler starting target of 30%. The DOE guide says top-performing facilities are under 10% reactive, so you can set a lower one.
Change the starting figures

These are U.S. averages and published figures. Replace any of them with your district's own.

Our calculation from NCES: 48,860,517 students ÷ 99,388 public schools in 2022-23.
U.S. average, NCES 2022-23.
Rule of thumb from the DOE guide: 12% to 18% savings over a reactive program.
The high end of the same range.
Add staff time saved (your own estimate)

There is no reliable published figure for the time a district saves on logging, chasing and reporting requests, so there are no starting values here. If you have your own estimate, enter all three. It is shown as its own line and added to the total.

Your own figure, for the whole team.
Your own estimate.
Your own figure, including benefits if you like. We count 52 weeks a year.

This calculator runs only in your browser. Nothing you type is sent, saved or tracked.

Estimated yearly savings

Your estimate shows here

Choose schools, students or square feet, enter the number and choose Estimate savings.

A generalized estimate for a typical district of this size. Your district's numbers will differ.

Contact us for pricing

What this leaves out

  • Longer equipment life.
  • Fewer emergencies and closed rooms.
  • Energy savings.

Sources of the figuresStudents per school: our calculation, 48,860,517 students ÷ 99,388 schools = about 492, from National Center for Education Statistics (NCES), Digest of Education Statistics 2023, tables 216.20 (https://nces.ed.gov/programs/digest/d23/tables/dt23_216.20.asp) and 216.10 (https://nces.ed.gov/programs/digest/d23/tables/dt23_216.10.asp), 2022-23.

Operation and maintenance spend per student: $1,581, NCES, Digest of Education Statistics 2025, table 236.60, “Operation and maintenance”, 2022-23, https://nces.ed.gov/programs/digest/d25/tables/dt25_236.60.asp.

Spend per square foot: $6.90, the average yearly cost to run and keep up school buildings per square foot (custodial, utilities, insurance, maintenance and repairs; not construction), FY2017–19. 21st Century School Fund, International WELL Building Institute and National Council on School Facilities, 2021 State of Our Schools, page 31, Table 3, https://www.dpi.nc.gov/documents/schoolplanning/ncsf-2021-state-our-schools-report/download.

Maintenance and repair share: 18%, Washington State's share, as an example: “64 Maintenance” was $313,767,987 of $1,731,566,686 total maintenance and operations in 2024-25 (our calculation, 18.1%). Office of Superintendent of Public Instruction, School District Financial Reporting Summary 2024-25, Table Five, https://ospi.k12.wa.us/sites/default/files/2025-12/24-25_f-196_section_1_for_posting.pdf. Washington defines maintenance as “the upkeep of property and equipment”, including “repair and upkeep”: OSPI, Accounting Manual for Public School Districts (effective September 1, 2023), chapter 6, https://ospi.k12.wa.us/sites/default/files/2023-08/000sdam2324all.pdf.

Reactive share and savings: US Department of Energy, Federal Energy Management Program, “Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency”, Release 3.0 (August 2010): an estimated 12% to 18% cost savings over a reactive program (section 5.3); the average facility is more than 55% reactive (section 5.2); top-performing facilities are under 10% reactive (section 5.5), https://www.energy.gov/sites/default/files/2020/04/f74/omguide_complete_w-eo-disclaimer.pdf. The 30% target is our own gentler starting point.

Where a district's operation and maintenance money goes

Every district spends money each year to run and look after its buildings. Federal statistics call this operation and maintenance. Across U.S. public schools it averaged $1,581 per student in 2022-23, according to the National Center for Education Statistics.

Most of that money is not maintenance. It also pays for custodians, utilities, insurance, grounds and security. Washington State publishes the split for all of its districts. In 2024-25, custodial work was about 35% of the total, utilities about 21%, insurance about 15%, and maintenance and repair about 18% (our calculation from the state's figures).

Planned maintenance saves money on maintenance and repair, not on electricity bills or insurance. So this estimator applies its savings only to the maintenance share.

How the estimate works

  1. SizeStart from schools, students or square feet. Schools are turned into students at 492 per school, our calculation from NCES counts.
  2. Operation and maintenance spendStudents × $1,581, or square feet × $6.90.
  3. Maintenance and repairThat spend × the maintenance share, 18% to start.
  4. Work shiftedMaintenance × (today's reactive share − your target), 55% − 30% to start.
  5. SavingsThe work shifted × 12% to 18%, the Department of Energy's range for preventive over reactive maintenance.

For example, 10 schools is about 4,920 students and $7,778,520 a year of operation and maintenance spend. The maintenance share is $1,400,134, the work shifted from reactive to planned is $350,033, and the estimated savings are $42,004 to $63,006 a year.

Where the figures come from

  • Spend per student: NCES Digest of Education Statistics, the U.S. average for 2022-23.
  • Students per school: our own calculation from NCES counts of students and schools for 2022-23.
  • Spend per square foot: the 2021 State of Our Schools report: the average yearly cost to run and keep up school buildings per square foot (custodial, utilities, insurance, maintenance and repairs; not construction), FY2017–19.
  • Maintenance share: Washington State's 2024-25 statewide figures, used as an example. Other states may differ.
  • Reactive share and savings: the US Department of Energy's Operations & Maintenance Best Practices guide. The average facility is more than 55% reactive; top performers are under 10%.

Full names and links are under the calculator. The 30% target is our own gentler starting point; set any target that fits your plan.

What this estimate leaves out

The estimate counts one thing: the savings on maintenance and repair from moving work from reactive to planned. It does not count:

  • Longer equipment life. Equipment that is looked after usually lasts longer, which pushes replacements back.
  • Fewer emergencies and closed rooms. A failed boiler or a leaking roof can close a classroom or cancel an event.
  • Energy. Well-kept equipment can use less energy, but that saving belongs to the utility budget.
  • Staff time on paperwork. There is no reliable published figure, so you can add your own estimate as a separate line.

It also leaves out what a new system costs. This page shows savings only; to talk about pricing, contact us.

Making the estimate your own

A generalized estimate is a starting point for a conversation with your board or business office. To make it yours:

  1. Use your own budgetReplace the spend per student with your district's own operation and maintenance budget.
  2. Find your maintenance shareYour chart of accounts usually separates maintenance from custodial work and utilities.
  3. Measure your reactive shareOver a year, compare the hours or spend on repairs and emergencies with the hours or spend on scheduled upkeep.
  4. Review it each yearWatch how the reactive share moves as planned work grows.

Read more in our guides to preventive maintenance plans and school work order systems.

How myFacilities helps you move to planned work

These myFacilities tools are built for this shift, and they share one set of data.

Work orders

Every job is recorded by school, room, asset and request type, so your work order history shows where your team's time goes. Filter it, save views and export it to a spreadsheet. School work orders.

Preventive maintenance scheduling

Each plan creates its work orders when they come due, with checklists and readings, and an overdue list keeps nothing hidden. Preventive maintenance plans.

iFCA™ inspections

Condition inspections on a phone find problems early and give every building a facility condition index. Facility condition index.

SMART™ Forecasting

Plans repairs and replacements years ahead from your asset and condition data, so worn-out equipment is replaced before it fails. Capital planning.

Questions about the calculator

Short answers for school leaders and board members.

How is the estimate worked out?

Operation and maintenance spend × the maintenance and repair share × (today's reactive share − your target) × the Department of Energy's 12% to 18% savings range. For 10 schools that is 4,920 students, $7,778,520 of spend, $1,400,134 of maintenance, and $42,004 to $63,006 a year.

Why does it use only 18% of the spend?

Operation and maintenance spending also pays for custodians, utilities and insurance. Planned maintenance saves money on maintenance and repair, so the savings apply only to that part. 18% is Washington State's 2024-25 statewide share, used as an example; type your own if you know it.

Where do the starting figures come from?

The spend per student is the U.S. average from the National Center for Education Statistics for 2022-23. Students per school is our own calculation from NCES counts. The spend per square foot comes from the 2021 State of Our Schools report. The reactive share and the savings range come from the US Department of Energy's Operations & Maintenance Best Practices guide. Full names and links are under the calculator.

What does the square-foot figure include?

It is the average yearly cost to run and keep up school buildings per square foot (custodial, utilities, insurance, maintenance and repairs; not construction), FY2017 to 19, from the 2021 State of Our Schools report. It covers running and upkeep, not new construction.

Does this include the cost of myFacilities?

No. The estimator shows savings only and includes no prices. Contact us for pricing.

Why is staff time optional?

There is no reliable published figure for the time a district saves on logging, chasing and reporting requests. If you have your own estimate, add it and it is shown as its own line.

Is anything I type saved or sent?

No. The calculator runs only in your browser. Nothing is sent, saved or tracked, and closing the page clears it.

Keep reading

Guides and product pages for school facilities teams.

See what planned work could do for your district.

If you would like to see how myFacilities schedules preventive maintenance and tracks every job, we are happy to show you.

Pick a time and we walk you through a sample school district.