Preventive maintenance savings calculator for any facility

Estimate what shifting work from repairs after breakdowns to planned upkeep could save each year, with starting figures from a U.S. Department of Energy guide that you can change.

  • Free, no sign-up
  • Nothing is saved

Estimate your savings

Enter your yearly maintenance spend. Today's share is pre-filled with the average from the DOE guide, and the target with a gentler 30%; you can change both. Dollar signs and commas are fine.

Everything your organization spends on maintenance in a year: staff, contractors and parts. For example $2,000,000.
Pre-filled with the DOE guide's figure: the average facility is more than 55% reactive. Change it to your own.
Pre-filled with 30%. The DOE guide says top-performing facilities do under 10% of their work reactively, so you can set a lower target.
Don't know your yearly spend? Work it out from floor area

Multiply your floor area by your own yearly maintenance cost per square foot, for example from a recent year's records. This calculator does not supply a cost per square foot, because there is no single figure that fits every type of building.

For example 850,000.
Your own figure.

This calculator runs only in your browser. Nothing you type is sent, saved or tracked.

Estimated yearly savings

Your estimate shows here

Enter your yearly maintenance spend and choose Estimate savings.

A rough rule of thumb based on the DOE guide; your results will differ.

Why planned work saves money

  • Fewer emergency call-outs and less overtime.
  • Longer equipment life.
  • Less secondary damage when something fails.
  • Better use of your team's time.

Source of the figuresUS Department of Energy, Federal Energy Management Program, “Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency”, Release 3.0 (August 2010), https://www.energy.gov/sites/default/files/2020/04/f74/omguide_complete_w-eo-disclaimer.pdf. Savings: an estimated 12% to 18% over a reactive program (section 5.3). Today's share: the average facility is more than 55% reactive (section 5.2). Target: top-performing facilities are under 10% reactive (section 5.5).

Fixing after failure, or before it

Reactive maintenance, often called run-to-failure, waits for equipment to break and then repairs it. Preventive maintenance (also called preventative maintenance) services it on a schedule so that it breaks less often: changing filters and belts, lubricating motors, testing alarms, clearing roof drains, tuning boilers.

Running to failure is a reasonable choice for cheap, non-critical things, such as a desk lamp or a small exhaust fan. For the equipment that keeps a building open, heated, cooled, dry and safe, it is seldom the cheaper path, because a breakdown costs far more than the repair itself: overtime, emergency call-out rates, damage to whatever sits around the failed part, and work that stops while it is fixed.

How the calculator works it out

It takes your yearly maintenance spend, multiplies it by the part of the work you shift from reactive to planned, and applies a savings range of 12% to 18% to that share.

  • Yearly maintenance spend$3,500,000
  • Reactive share today, and your target60% and 35%
  • Work moved to planned: $3,500,000 × 25%$875,000
  • Savings at 12%: $875,000 × 0.12$105,000
  • Savings at 18%: $875,000 × 0.18$157,500
  • Estimated yearly savings$105,000 to $157,500

The range applies only to the work that moves. That keeps the estimate modest: a team that already plans most of its work will see a small figure, and for that team a small figure is the honest answer.

A federal guide for every type of facility

The starting figures come from the U.S. Department of Energy's Federal Energy Management Program guide Operations & Maintenance Best Practices (Release 3.0, 2010), which was written for all types of facilities rather than one sector. It estimates that a preventive maintenance program saves 12% to 18% over a reactive one, and it also supplies the reactive share for an average facility that the calculator starts with. The top performers it describes do less than 10% of their work reactively.

The 30% target is myFacilities' own starting point: a step most teams can plan for within a year or two, rather than the top performers' figure. Change both shares to match your own records.

Reading the estimate with care

  • One range for everything. Real savings differ with the equipment, its age and how reactive things are today. Treat the result as a first estimate for a budget conversation.
  • It takes time. Shifting work toward planned maintenance takes effort first: an asset list, written plans and the hours to carry them out. Savings build over several years.
  • Energy is left out. Well-kept equipment often uses less energy, but the calculator does not count it.
  • Your records come first. A year of work order history, sorted into planned and reactive, says more about your buildings than any national average.

Moving the first share of work

  1. Measure the splitOver twelve months, add up the hours or spend on breakdowns and emergencies and divide by all maintenance.
  2. Choose critical equipment firstHeating, cooling, roofs and drains, fire and life safety, and anything whose failure stops the work done in the building.
  3. Write plans people can followA task list, a frequency and a named owner for each plan.
  4. Review the numbers monthlyLook at what is overdue, how the reactive share is moving and which equipment keeps failing.

In myFacilities, plans create work orders when they come due, technicians work through phone checklists and readings that send when signal returns, and the overdue list shows what has slipped. Filters and export to a spreadsheet give you the reactive share to enter here.

Planned maintenance in your type of organization

The estimate works the same way everywhere. Which failures cost most, and where planned work should start, differ by type of organization.

  • Schools (K-12). In a school, a failed boiler or rooftop unit can close classrooms, move lessons and cancel events, a cost no budget line shows, so start plans with heating, cooling, fire safety and roofs. Measure the reactive share from work order history school by school, and take the estimate to the board as a conversation starter rather than a budget line.
  • Higher education. Start with central plant equipment, research building air handling and residence hall systems, where one failure affects many people at once. Many campuses already report planned and corrective hours to leadership; use the same split here.
  • Government and public works. Agencies that must account for every dollar can use the estimate to support a budget request for planned work, in-house or contracted. Water and wastewater plants usually run their own maintenance programs, so keep them apart from buildings.
  • Healthcare. Hospitals already schedule a great deal of required inspection and testing, so the reactive share can look low; measure it on repairs and emergencies alone. A failure in a clinical area costs far more than its repair, from cancelled procedures to patients sent elsewhere.
  • Corporate. If a contractor maintains your buildings, ask for a year of work orders split into planned and reactive; many contracts already report it. Downtime in offices shows up as lost working hours, which this estimate does not count.
  • Retail and hospitality. Refrigeration, HVAC and kitchen equipment are common causes of emergency calls in stores and restaurants, and a failure can mean spoiled stock or a closed dining room. Start plans there, and measure the reactive share by location to see which sites need help first.
  • Sports and recreation. Pools, ice plants, field lighting and arena HVAC tend to fail at the worst moment, during events and the busy season. Schedule their preventive maintenance in quiet periods, and count cancelled events as part of the real cost of a breakdown.
  • Fire and police stations. Generators, apparatus bay doors, exhaust removal and HVAC keep a station ready to respond, and a breakdown can take a bay out of service. Those systems are where planned work should start, with records kept on each one.
  • Industrial and manufacturing. Unplanned downtime on building systems such as compressed air, power distribution and HVAC for process areas costs far more than the repair. Building and utility maintenance often shares a crew with production equipment, so measure the facility share on its own.
  • Religious organizations. Maintenance is often handled by a small team and volunteers, so a short list of critical items, such as heating, roofs, drains and fire alarms, gives the biggest return. A failure on the day of a service or a large event is the cost to avoid.

Worked examples. One for each type of organization, with its own numbers.

  • Schools (K-12): A district cutting reactive work from 62% to 40%

    • Yearly maintenance spend$3,400,000
    • Reactive share today, and the target62% and 40%
    • Work moved to planned each year$748,000
    • Estimated yearly savings$89,760 to $134,640
    Bringing the reactive share down from 62% to 40% moves about $748,000 of the district's yearly maintenance from emergency calls to scheduled work. The estimate puts the yearly saving at $89,760 to $134,640, before counting the lessons and events lost when a boiler or rooftop unit fails during the school day. Start the plans with heating, cooling, fire alarms and roofs, measure the reactive share for each building from work order history, and take the range to the school board as a starting point for budget talks.
  • Higher education: A university moving from 55% to 35% reactive work

    • Yearly maintenance spend$14,500,000
    • Reactive share today, and the target55% and 35%
    • Work moved to planned each year$2,900,000
    • Estimated yearly savings$348,000 to $522,000
    On a campus spending $14,500,000 a year, cutting reactive work from 55% to 35% moves $2,900,000 into planned visits and is estimated to save $348,000 to $522,000 a year. The larger benefit is fewer failures that hit hundreds of people at once: a central plant pump, a research building air handler, or residence hall heating in January. Use the planned and corrective hours your institution already reports, and set targets by zone so each shop can see its own progress.
  • Government and public works: An agency making the case for planned work

    • Yearly maintenance spend$1,850,000
    • Reactive share today, and the target58% and 38%
    • Work moved to planned each year$370,000
    • Estimated yearly savings$44,400 to $66,600
    Moving the agency's reactive share from 58% to 38% shifts $370,000 a year of building work into planned visits, with an estimated saving of $44,400 to $66,600 a year. For a public body, the value lies as much in the record as in the dollars: planned work can be scheduled, contracted and reported to the council line by line. Keep water and wastewater plants out of this figure, begin with roofs, HVAC and fire alarms in the busiest buildings, and report the reactive share each quarter.
  • Healthcare: A hospital measuring reactive work on repairs alone

    • Yearly maintenance spend$22,000,000
    • Reactive share today, and the target45% and 30%
    • Work moved to planned each year$3,300,000
    • Estimated yearly savings$396,000 to $594,000
    Counting only repairs and emergencies, this hospital's reactive share is 45%. Bringing it to 30% moves $3,300,000 a year into planned work and is estimated to save $396,000 to $594,000 a year. That figure leaves out the larger cost of a failure in a clinical area: a cancelled procedure, a unit closed for a leak, or patients moved elsewhere. Start with air handling for surgical and isolation rooms, medical gas alarms and emergency power, and report progress alongside the required testing your team already does.
  • Corporate: Office buildings maintained mostly by a contractor

    • Yearly maintenance spend$1,350,000
    • Reactive share today, and the target50% and 30%
    • Work moved to planned each year$270,000
    • Estimated yearly savings$32,400 to $48,600
    With half of the work reactive today, moving to 30% shifts $270,000 a year of maintenance into planned visits and saves an estimated $32,400 to $48,600 a year. Ask the facilities vendor for twelve months of work orders divided into planned and reactive jobs; many contracts already report this, and it is the baseline for any change. The estimate leaves out working hours lost when an office is too hot or a restroom is out of order, which employees notice first. Write the new target into the next contract review.
  • Retail and hospitality: Stores where refrigeration drives emergency calls

    • Yearly maintenance spend$4,800,000
    • Reactive share today, and the target68% and 45%
    • Work moved to planned each year$1,104,000
    • Estimated yearly savings$132,480 to $198,720
    Across the company's stores, 68% of maintenance is reactive today. Getting to 45% shifts $1,104,000 a year to scheduled work, with an estimated saving of $132,480 to $198,720 a year, before counting spoiled stock and lost sales when a case or cooler fails. Begin with refrigeration, rooftop units and kitchen equipment, measure the reactive share location by location, and send technicians to the weakest locations first. A monthly coil cleaning and gasket check prevents many of the calls that arrive on weekends.
  • Sports and recreation: Parks and venues with a busy summer season

    • Yearly maintenance spend$900,000
    • Reactive share today, and the target64% and 40%
    • Work moved to planned each year$216,000
    • Estimated yearly savings$25,920 to $38,880
    Moving the reactive share from 64% to 40% shifts $216,000 a year of maintenance into planned work, saving an estimated $25,920 to $38,880 a year. The bigger cost sits outside that range: a pool closed on a hot weekend, an ice plant fault before a tournament, or field lights that fail during a league game. Build the plan around those systems, schedule their service in the quiet months, and count each cancelled event and refund as part of what a breakdown really costs.
  • Fire and police stations: A small department with three stations

    • Yearly maintenance spend$340,000
    • Reactive share today, and the target70% and 45%
    • Work moved to planned each year$85,000
    • Estimated yearly savings$10,200 to $15,300
    For a department spending $340,000 a year on its stations, bringing reactive work from 70% to 45% moves $85,000 into planned work and is estimated to save $10,200 to $15,300 a year. The money matters less than readiness: a bay door that will not open or a generator that fails its weekly test can take a station out of service. Put those systems, plus exhaust removal and HVAC, on a fixed schedule, keep a log on each, and ask every shift to report problems the same day.
  • Industrial and manufacturing: Plant utilities moving to planned maintenance

    • Yearly maintenance spend$3,900,000
    • Reactive share today, and the target57% and 33%
    • Work moved to planned each year$936,000
    • Estimated yearly savings$112,320 to $168,480
    Shifting building and utility work at the plant from 57% to 33% reactive moves $936,000 a year into planned work, worth an estimated $112,320 to $168,480 a year. The figure does not include downtime, which is usually far larger: one compressed air or power fault can stop production for a whole shift. Measure the facility share apart from production equipment, start with compressors, switchgear and HVAC for process areas, and put the heavier tasks into planned shutdowns with proper lockout.
  • Religious organizations: A small budget with a few critical items

    • Yearly maintenance spend$48,000
    • Reactive share today, and the target75% and 45%
    • Work moved to planned each year$14,400
    • Estimated yearly savings$1,728 to $2,592
    With 75% of a $48,000 budget spent on reactive repairs, moving to 45% shifts $14,400 a year into planned work and saves an estimated $1,728 to $2,592 a year. That is modest, but the real gain is avoiding a heating failure, a roof leak or a fire alarm fault on the day of a large service. Keep a short list of critical items, have volunteers check drains and gutters each season, and ask a contractor to service the boiler before the cold months.

Sources

Questions about preventive maintenance savings

Short answers for facilities leaders and finance teams.

How is the estimate worked out?

Spend × (today's reactive share − your target) gives the work moved to planned, and the 12% to 18% range is applied to that amount. With $3,500,000, 60% today and a 35% target, that comes to $105,000 to $157,500 a year.

Where do the starting numbers come from?

Today's reactive share and the savings range come from the Department of Energy's operations and maintenance guide, which covers every type of facility. The 30% target is a starting point myFacilities chose; set your own.

Should we aim for under 10% reactive?

That is where the guide's top performers are. For most teams it is a long-term goal; a nearer target is easier to plan, staff and measure, and you can lower it as you go.

How do we find our reactive share?

From your work orders. Over a year, divide the hours or spend on repairs after failures and on emergencies by the total for all maintenance work.

Does the estimate include energy savings?

No. Better-kept equipment often uses less energy, but how much depends on the equipment, so it is left out to keep the estimate conservative.

Is anything I type saved or sent?

No. Your spend and shares are used only inside this page, in your browser. They are not sent, logged or kept after you leave.

Keep going

Free calculators and product pages for planned maintenance.

Spend less time on emergencies.

We are happy to show you how myFacilities schedules preventive maintenance and keeps every job on record.