Facility maintenance in Pennsylvania
Pennsylvania moved to 2021 ICC code provisions on January 1, 2026, and its elevators still need an inspection every 6 months.
Pennsylvania at a glance
- 2,936Public schoolsStatewide
- 307HospitalsStatewide
- 13,231ManufacturersStatewide
- 500School districtsStatewide
- 29.7daysHighs of 90°F+Philadelphia
- 44.1inSnowfall each yearPittsburgh
What Pennsylvania's climate does to buildings
Pennsylvania winters drive heating everywhere, so plan boiler work statewide and give each region's cooling and snow work its own calendar.
Pittsburgh and western Pennsylvania
Western snow and frost
Pittsburgh averages 44.1 inches of snow and 113.6 days with a low at or below 32°F. Protect exposed piping and keep roof drains flowing through each thaw.
Heating still leads
Pittsburgh also averages 5,571.8 heating degree days a year. Put boiler tune-ups and controls checks on every fall schedule.
Philadelphia and the southeast
Southeast cooling load
Philadelphia logs 1,358.3 cooling degree days and 29.7 days at 90°F or hotter. Service chillers and rooftop units in spring, and check refrigerant charge before July.
Across Pennsylvania
Two energy code zones
Counties fall in zones 4A and 5A. Confirm each site's zone before specifying insulation, windows or heating equipment under the 2021 energy code.
A maintenance year in Pennsylvania
- JanCheck boiler low-water cutoffs and safety valves
- FebBook the first of two elevator inspections
- MarInspect roofs and flashing after freeze-thaw cycles
- AprPhiladelphiaStart cooling at southeast sites first
- MayClean condenser coils and change air filters
- JunBegin summer projects while buildings are quieter
- JulCheck chillers and refrigerant during peak heat
- AugBook the second elevator inspection of the year
- SepTune boilers and test heating controls
- OctClear gutters and roof drains after leaf fall
- NovPittsburghDrain exposed water lines at western sites
- DecCheck heat trace and sprinkler rooms for freezing
Codes and inspections in Pennsylvania
| Rule | Who inspects or enforces | How often |
|---|---|---|
| Uniform Construction Code: 2021 ICC code provisions | Department of Labor and Industry and municipal code officials | Permits and new work from January 1, 2026 |
| Accessibility: 2018 requirements still apply | The same code officials, after a 2022 court ruling | Every permit and new project |
| Energy code for commercial buildings: 2021 IECC, ASHRAE 90.1-2019 | Statewide, through the same code officials | Commercial permits from January 1, 2026 |
| Power, process and low-pressure steam boilers | Labor and Industry Boiler Division or an insurance inspector | Power and process every 12 months; low-pressure steam every 24 |
| Elevators and escalators | A construction code official or third-party agency | At least every 6 months |
Rules and funding by type of organization
State money for school repairs
Act 33 of 2023 created a program that pays to fix lead in water and paint, asbestos and mold in schools. Separately, $175 million in facility improvement grants were approved in October 2024.
Find your type of organization
What to do this year
- Set six-month elevator checks and yearly power boiler inspections as recurring work, so no certificate lapses.Recurring inspections
- Score each building's condition so grant applications rest on current data.Facility condition index (FCI) calculator
- Plan cooling replacements at southeast sites by expected life, not by summer breakdowns.Equipment life expectancy calculator
- Keep a rolling schedule of condition assessments for every building, oldest first.Facility condition assessment schedule
- And much more. Let myFacilities build your custom to-do list, so you can plan, maintain and budget for your facilities with confidence.Book a call
Questions about Facilities Management in Pennsylvania
How often are elevators inspected in Pennsylvania?
Electric and hydraulic elevators and escalators at intervals of no more than 6 months. Other lifting devices need an inspection at least every 12 months.
When did Pennsylvania's 2021 code update take effect?
January 1, 2026. The 2021 accessibility updates stay blocked by a 2022 court decision, so the 2018 accessibility requirements still apply.
How often must power boilers be inspected in Pennsylvania?
Inside and out every 12 months, and process boilers on the same cycle. Low-pressure steam boilers are inspected every 24 months.
How hot do summers get in southeastern Pennsylvania?
Philadelphia's airport station averages 29.7 days a year at 90°F or hotter and 1,358.3 cooling degree days. Service chillers and rooftop units before June.
Every inspection and repair in Pennsylvania, planned in one place.