Facility condition index calculator for any building

Divide the work your buildings are waiting for by what they would cost to replace, and see where each one stands. Use it for one building, a site or your whole portfolio.

  • Free, no sign-up
  • Nothing is saved

Calculate your FCI

Enter the numbers for one building, one site or all of your buildings. Dollar signs and commas are fine.

This tool serves every type of building. For schools, the school FCI calculator starts from a published school construction cost.

Repairs and replacements that are due but not done. For example $1,500,000.
What it would cost to replace the building today. For example $20,000,000.
No replacement value? Work one out from the building's size

Multiply the building's area by a replacement cost per square foot. There is no starting figure: construction costs differ so much by building type and region that one national number would mislead. Use a figure you trust, such as your insurance schedule's replacement cost divided by the area, a recent estimate, or what similar buildings near you cost to build.

For example 85,000.
Your own figure for this type of building in your region. For example $400.

This calculator runs only in your browser. Nothing you type is sent, saved or tracked.

Facility condition index

Your result shows here

Enter both amounts and choose Calculate FCI.

In myFacilities, SMART™ keeps this number for your organization, every site and every building, updated from inspections, deficiencies and asset records, and shows it beside your multi-year capital plan.

One number for the state of a building

The facility condition index puts a building's condition into a single percentage: the cost of the repairs and replacements it needs now, divided by what it would cost to build again today. A low number means most of the building's value is in good order. A high number means a large share of it is waiting for money.

Because it is a ratio, FCI lets you compare a 4,000 square foot branch building with a 400,000 square foot headquarters, or the same building this year and five years ago. That is why capital planners, finance officers and boards use it as the headline for a portfolio, even though nobody would run a building on the number alone.

Where the two numbers come from

The deferred maintenance backlog is the priced list of work that is due and not done: a roof past its life, a chiller that should have been replaced, failing windows, worn flooring. It usually comes from a facility condition assessment, where someone walks each building, rates its systems and puts a repair or replacement cost on each finding.

The current replacement value is what it would cost to rebuild the same building to today's standards. Property insurance schedules, cost estimates and recent construction in your area are the usual sources. Leave out land, furniture and equipment that is not part of the building, and keep that choice the same for every building you compare.

  1. Use one scope everywhereDecide whether site work, parking and outbuildings count, and apply it to every building, or the comparisons will mislead.
  2. Price findings the same wayA backlog priced by three different people with three different methods is three different numbers.
  3. Refresh replacement valuesConstruction costs move every year. A value from a decade ago makes every FCI look better than it is.
  4. Write down the dateAn FCI is a snapshot. Note when the assessment and the values were done.

Adding up a portfolio

To find the FCI of several buildings together, add the dollars, not the percentages. A small building in poor shape should not count as much as a large one in good shape.

  • Building A: $360,000 needed, $12,000,000 to replace3.0%
  • Building B: $1,200,000 needed, $8,000,000 to replace15.0%
  • Building C: $1,000,000 needed, $20,000,000 to replace5.0%
  • Average of the three percentages (misleading)7.7%
  • Portfolio FCI: $2,560,000 ÷ $40,000,0006.4%

The portfolio sits in the Fair band, but Building B is in Poor and drives almost half of the backlog. That is the conversation to have: the portfolio number for the trend, the building numbers for where the next dollars go.

What FCI leaves out

  • Safety and code. A building with a low FCI can still have an urgent fire, life safety or accessibility problem that needs fixing first.
  • Whether the building still fits. FCI says nothing about crowding, layout or whether the space still suits the work done in it.
  • What is coming. It counts work due now. A building whose roof, boilers and switchgear all reach the end of their lives in three years can still score well today.
  • Running costs. Energy use and maintenance labor are outside the formula.

For those reasons, many organizations pair FCI with a list of the systems due for replacement in the next five to ten years, so the capital plan sees the wave before it arrives.

FCI for your type of building

The formula is the same everywhere. What goes into the backlog, and where a replacement value comes from, differ by type of building.

  • Higher education. Campuses often report FCI by building and for the whole campus. Residence halls and auxiliary buildings paid for by their own revenue are usually shown apart from academic buildings, because their capital comes from different budgets.
  • Government and public works. Agencies often carry replacement values in their insurance or risk pool schedules. Keep buildings apart from roads, bridges and utilities: those networks are assessed on their own condition scales.
  • Healthcare. Hospitals cost far more per square foot to build than offices, because of their air handling, medical gas, emergency power and life safety systems, so a figure from another building type will understate the replacement value. Survey findings from the Statement of Conditions and life safety rounds belong in the backlog.
  • Corporate. In leased buildings, count only the systems you are responsible for under the lease. For owned headquarters and campuses, FCI by building helps decide where to invest and which buildings to sell or consolidate.
  • Retail and hospitality. Brand standards and planned renovation cycles often decide the timing of interior work, so keep guest-facing finishes apart from the building's core systems: roofs, HVAC, plumbing and electrical drive the backlog that FCI measures.
  • Sports and recreation. Venues mix buildings with large outdoor assets: seating, lighting, turf, courts and pools. Decide whether those count, apply the choice to every site, and give pools and ice plants their own lines, since they age quickly.
  • Fire and police stations. Stations run around the clock, so their systems wear faster than an office's. Apparatus bay doors, exhaust removal, generators and fuel systems are common backlog items; keep vehicles and equipment out of the building's FCI.
  • Religious organizations. Many congregations and organizations already keep a reserve study or an insurance schedule; either gives a replacement value. Older buildings with historic features can cost more to repair like for like, so price those findings with that in mind.

Worked examples. One for each type of organization, with its own numbers.

  • Higher education: Chemistry, library and a residence hall on one campus

    • Chemistry building: $6,300,000 needed, $84,000,000 to replace7.5%, Fair
    • Residence hall: $1,100,000 needed, $42,000,000 to replace2.6%, Good
    • Main library: $2,900,000 needed, $58,000,000 to replace5.0%, Fair
    • All together: $10,300,000 ÷ $184,000,0005.5%, Fair
    The campus figure of 5.5% sits in Fair, but the three buildings are not alike. The chemistry building leads at 7.5%, driven by lab exhaust and fume hood systems that faculty rely on, while the residence hall rates Good at 2.6%. Housing is usually paid from its own revenue, so report it apart from the two academic buildings, whose backlogs compete for the same capital money. Next, price the chemistry findings system by system and bring the top items to the coming capital planning cycle.
  • Government and public works: City hall, a public works garage and a branch library

    • City hall: $1,450,000 needed, $26,000,000 to replace5.5%, Fair
    • Public works garage: $1,900,000 needed, $9,500,000 to replace20.0%, Poor
    • Branch library: $210,000 needed, $6,800,000 to replace3.0%, Good
    • All together: $3,560,000 ÷ $42,300,0008.4%, Fair
    Across the three buildings the agency rates Fair at 8.4%, yet one building carries most of the problem. The public works garage sits at 20.0%, deep in Poor, while city hall is Fair at 5.5% and the branch library Good at 3.0%. Garages take hard use from fleet vehicles, road salt and exhaust, so roofs, doors and ventilation wear quickly. Put the priced garage findings into the next capital improvement request, and keep roads and utilities out of this figure so it stays comparable from year to year.
  • Healthcare: A community hospital with a growing backlog

    • Deferred maintenance backlog$7,800,000
    • Current replacement value$62,000,000
    • Facility condition index12.5%, Poor
    At 12.5%, this community hospital rates Poor: $7,800,000 of repairs and replacements are due against a building worth $62,000,000 to replace. In a hospital that figure weighs more than in an office, because air handling, medical gas and emergency power must keep running while they are repaired. Sort the backlog by risk to patients, separating life safety findings from the last survey and infection control work from general wear. Then set a target for the next three years and fund the highest risk items first.
  • Corporate: A headquarters and one regional office

    • Headquarters: $2,100,000 needed, $72,000,000 to replace2.9%, Good
    • Regional office: $1,350,000 needed, $14,500,000 to replace9.3%, Fair
    • All together: $3,450,000 ÷ $86,500,0003.9%, Good
    The portfolio rates Good at 3.9%, but that figure mostly reflects the headquarters, which is far larger and sits at 2.9%. The regional office is close to the Poor line at 9.3%. Before spending there, read the lease: if the landlord owns the roof and central systems, your share of that backlog may be small. If the office is owned and staying, plan its larger items over two or three years; if a move is likely, fix only what keeps employees safe and comfortable until then.
  • Retail and hospitality: A select-service hotel heading for renovation

    • Deferred maintenance backlog$2,250,000
    • Current replacement value$21,000,000
    • Facility condition index10.7%, Poor
    With $2,250,000 of work due on a building worth $21,000,000 to replace, the hotel rates Poor at 10.7%. Guests notice finishes first, but this figure is about roofs, HVAC, plumbing and electrical, the systems that take rooms out of service when they fail. If a brand renovation is planned, fold the core system work into the same closure so each floor is out of use only once. Ask the assessor to split the backlog into guest-facing and core items, then fund the core list ahead of the renovation.
  • Sports and recreation: An ice arena, an aquatic center and a field house

    • Ice arena: $3,400,000 needed, $28,000,000 to replace12.1%, Poor
    • Aquatic center: $1,900,000 needed, $17,500,000 to replace10.8%, Poor
    • Field house: $380,000 needed, $11,000,000 to replace3.4%, Good
    • All together: $5,680,000 ÷ $56,500,00010.0%, Poor
    Together the three venues come to 10.0%, right at the point where Fair turns to Poor. Two buildings pull the figure up: the ice arena at 12.1% and the aquatic center at 10.8%, while the field house is Good at 3.4%. Ice plants and pool systems age faster than the buildings around them, so give each its own line in the assessment rather than letting a healthy building hide them. Schedule the arena's refrigeration and the pool's filtration work for the off-season, before the event calendar fills.
  • Fire and police stations: Three fire stations and a police headquarters

    • Station 1: $1,150,000 needed, $7,400,000 to replace15.5%, Poor
    • Station 2: $420,000 needed, $8,200,000 to replace5.1%, Fair
    • Station 3: $95,000 needed, $9,600,000 to replace0.9%, Good
    • Police headquarters: $1,300,000 needed, $22,000,000 to replace5.9%, Fair
    • All together: $2,965,000 ÷ $47,200,0006.2%, Fair
    The department's four buildings rate Fair at 6.2%, but Station 1 stands apart at 15.5%, well into Poor. The newest, Station 3, is Good at 0.9%, and Station 2 and the police headquarters sit in Fair at 5.1% and 5.9%. Stations are occupied every shift, so generators, bay doors and exhaust removal wear faster than in an office. List the Station 1 findings by how much they affect response readiness, fund those first, and compare the total with the cost of a full renovation.
  • Religious organizations: A main building and a social hall

    • Main building: $540,000 needed, $6,900,000 to replace7.8%, Fair
    • Social hall: $260,000 needed, $2,100,000 to replace12.3%, Poor
    • All together: $800,000 ÷ $9,000,0008.8%, Fair
    Taken together, the two buildings rate Fair at 8.8%. The social hall is the concern: at 12.3% it is already Poor, while the main building is Fair at 7.8%. A hall that hosts meals, classes and community rentals takes heavy wear on floors, kitchen and restrooms. Ask the building committee to price the hall's findings and decide which can wait for a capital campaign. Also confirm the insurance value is current, since an outdated value can make the congregation's figures look worse than they are.

Sources

  • Bands: the ones myFacilities SMART™ uses (under 5% Good, under 10% Fair, through 40% Poor, over 40% Critical). Other organizations draw them slightly differently.

Questions about FCI

Short answers for facilities, finance and capital planning teams.

What is a good FCI?

In myFacilities, under 5% is Good, 5% up to 10% is Fair, 10% through 40% is Poor and over 40% is Critical. Many organizations set a goal such as keeping every building out of Poor, then use FCI each year to check progress.

Why is there no starting cost per square foot?

Replacement costs differ several times over between building types and regions. A national average for one type of building would be wrong for most others, so the field starts empty. Your insurance schedule or a recent estimate will be closer than any average.

Can I work out FCI for a whole portfolio?

Yes. Add the backlogs of all the buildings and divide by the sum of their replacement values. Do not average the buildings' percentages: that gives a small building as much weight as a large one.

Should planned replacements in the next few years count?

Not in FCI itself, which counts work that is due now. Keep the coming replacements in a separate list by year, so you can see the backlog you have and the one that is on its way.

Can FCI be more than 100%?

Yes, when the backlog is larger than the replacement value. Check both numbers first. If they are right, replacing the building may cost less than repairing it.

Is anything I type saved or sent?

No. The calculator runs only in your browser. Nothing is sent, saved or tracked, and closing the page clears it.