Blog · Planning
How to run small projects alongside everyday maintenance
A room refresh or a boiler swap is too big for a work order and too small for a project office. Run it with a scope, a budget and a clean handoff.
The request sounds simple. Refresh the break room. Replace the rooftop units on the east wing. Add a door and a card reader to the storeroom. None needs a project office, and none fits on a single work order. These small projects fall to the facilities team on top of the daily queue, and they go wrong in familiar ways: the scope grows, nobody tracks the budget, the schedule collides with operations and the new equipment never reaches the maintenance plan.
In short
- Write a one-page scope that says what is included, what is not and who accepts the result.
- Budget by line, hold a contingency and track committed cost as well as spent cost.
- Set the schedule around operations, long-lead items and permits, and give contractors a written scope.
- Approve every change in writing, and close out with records and a handoff to maintenance.
Scope: say what is in and what is out
A one-page scope is enough for a small job. State the purpose, the location, what is included and what is not. The exclusions matter most: paint is not included, furniture is not included, the ceiling above is not touched. Add the constraints, such as hours, noise and occupied space. Name the person who asked, the person who pays and the person who accepts the finished work.
Walk the site before you write it, with the person who will use the space and the technician who will maintain what you install. The technician will ask where the filter goes and how to reach the valve, which are questions a design drawing can miss.
Budget and schedule
List the budget by line: design, materials, labor, permits, disposal, equipment, furniture and moving. Hold a contingency as a separate line, and spend it only through change control. Track what is committed as well as what is spent, because a signed order is money gone even before the invoice arrives. Compare written quotes against the same scope, so the comparison is fair.
Build the schedule backward from the date the work must be finished. Check the lead time for equipment, the time permits take and the seasons when you cannot shut a system down, such as the heating season for a boiler. Sequence the trades, and leave slack. Tell the people in the space what will happen and when. For occupied buildings, see our post on maintenance in occupied healthcare buildings, which applies well beyond healthcare.
Contractors and change control
Give every contractor the written scope, the site rules and the hours. Ask for proof of insurance, and check with your local authorities for any license the work needs. Name one contact on each side. Brief contractors on safety, on which areas are off limits and on how to protect the people who stay in the building. Where a job touches structure, electrical or plumbing systems, fire protection or life safety, follow your local rules for permits and for licensed design and installation.
A small project stays small when every change is written down and approved before the work happens, and not after.
Change control is a short habit. Anyone who wants a change, including the owner, writes it down with its cost and its effect on the date. A named person approves it before the work begins. Keep a change log, and draw the contingency from it. When a contractor finds a hidden problem, stop, take photos, price the change and decide before work continues. If there is a safety risk, make the area safe first. If it could be a hazardous material, keep people out of the area and follow your local rules before anyone continues.
Closeout and the handoff to maintenance
A project is not done when the contractor leaves. Walk the work with a punch list, and give each item an owner and a date. Collect the closeout records: as-built drawings, product data, manuals, warranties with start and end dates, test and start-up results, permit sign-offs, final costs and photos.
In myFacilities, project management, assets and documents are in the same account. Whatever tool you use, the handoff is the same set of jobs:
- Add each new asset to the asset list with its location, install year and expected life.
- Set up its preventive maintenance.
- List the spare parts it needs, as in our post on spare parts on hand.
- Show the technicians how to service it.
- Label it, and remove the old equipment from the list.
- File the manuals and warranties in your document library, as described in our post on digitizing drawings, manuals and warranties.
Figure A small project, start to handoff
- ScopeWrite what is in, what is out and who accepts the result.
- PlanSet budget lines, a contingency and a schedule around operations.
- BuildContractors work to a written scope, with changes approved in writing.
- Close outWalk the work, clear the punch list and collect the records.
- Hand overAdd the new assets to the list and set up their maintenance.
The project management page describes the project tools. Many small projects come out of a capital plan, as our post on capital planning from condition data explains.
Questions teams ask about small projects
When is a job a project and not a work order?
When it has a scope to agree, more than one trade, a budget to track or a new asset at the end. Write your own rule down, so everyone applies it the same way.
How large should the contingency be?
Set it from the uncertainty. Work behind walls or in older buildings carries more than a simple replacement. Hold it separately, and release it only through change control.
Do small jobs need drawings?
Often a sketch and a marked-up plan are enough. For work that touches structure, fire protection or electrical or plumbing systems, follow your local rules and ask your authorities whether permits or licensed design are needed.
How do we stop scope from growing?
Keep the written scope and the exclusions list in front of everyone, and require every change to go through the change log.
See projects next to your daily work
Walk through projects, assets and documents in one account on your own sites.