Skip to content
Menu

Blog · Assets

Spare parts on hand: what to stock, how much and how to track it

A missing belt or fuse can stop a plant or a building system. Stock the right spares, label them well and record every part you use.

Book a call
  • By myFacilities team
  • Published November 6, 2026
  • 5 min read

On a Friday afternoon a belt snaps on an air handler, and the one belt that fits has to be ordered. In a plant, the same story is a drive that halts a line. Spares are a quiet kind of insurance, and they only work if the right ones are on the shelf, where people can find them, and counted. A storeroom that holds everything is as unhelpful as one that holds nothing.

In short

  • Stock parts for equipment that is critical, wears out in a predictable way or takes a long time to get.
  • Set a minimum level for each part from how fast you use it and how long a new one takes to arrive.
  • Label bins and shelves so anyone can find a part and see what it fits.
  • Record each part on the work order that used it, so the shelf matches the system.

Decide what to stock

Sort parts into three groups. Consumables are used steadily: filters, fuses, lamps, gaskets, batteries and lubricants. Wear parts are replaced as equipment ages: bearings, seals, contactors and belts. Critical spares are the parts whose absence stops a line, closes a space or leaves people unprotected, and which are slow or costly to get.

Do not stock a part that a supplier delivers the same day, unless the equipment it serves is critical. Do stock the part that has a long wait, a single source or a high cost of being without it. Start from your asset list. Rank equipment by what its failure does, as in our post on preventive maintenance for production equipment, and then look at the work orders to see which parts you replaced. In a plant, the drive for a packaging line is a likely critical spare. In an office building, it may be the ignition control for a boiler or the contactor for a rooftop unit.

Set minimum levels with simple rules

A minimum level is the count at which you must act. It has to cover the time a new part takes to arrive, plus a cushion for a bad week. Work it out from three facts: how many of the part you use in a year, how long the supplier takes, and how bad it is to run out.

For a critical spare with a long wait, the minimum may be one on the shelf, and using it means someone orders its replacement that day. For a filter you change every season, the minimum is the number you need for the next round plus a few. Write the minimum on the bin label, so whoever takes the last one knows what to do.

Nothing in this works unless someone checks the shelf against the minimums on a regular rhythm and decides who orders. Review the levels after any stock-out, after you replace equipment and when your supplier changes its lead times. Retire spares for equipment that has gone.

Store and label so parts are found

Keep spares in one place, clean and dry, and out of heat and damp. Lock up the costly and the attractive: motors, drives, tools and anything that is useful at home. Rotate items with a shelf life, such as batteries, gaskets and lubricants, so the oldest goes first. Store chemicals and other hazardous materials as the manufacturer and your local rules direct.

Label every bin or shelf with the part name, the part number, the equipment it fits, its location and its minimum. Use the same equipment names as the asset record, so a technician reading a work order can match the part to the machine. For critical spares, mark the label so that nobody borrows one without telling the person who owns the stock. A photo of the part inside the bin helps new staff.

The shelf and the work orders should tell the same story, or neither can be trusted.

Record parts on the work order

In myFacilities, parts are tracked in stock and used on work orders. Whatever system you use, the habit is the same: record the part at the moment it leaves the shelf, against the job and the asset that used it. Then the work order shows which part went on which machine, and each change to the shelf count can be traced to a job.

Figure The spare parts loop

  1. DecideChoose what to stock from criticality, use and lead time.
  2. StockStore each part where people can find it, with a clear label.
  3. UseTake the part against a work order, and not from memory.
  4. RecordLog the part on the work order and update the count.
  5. ReviewCheck the minimums after use, after a stock-out and after equipment changes.
The loop keeps the shelf, the records and the equipment in agreement.

Count a few bins at a time on a set schedule, and correct the differences. Handle returns and borrowed parts the same way as parts used. Give one person ownership of each storeroom, and make anyone else who takes a part record it.

The parts history is also evidence. If one asset eats the same part again and again, you have a reason to look at its cause, or at replacement. Our post on repair or replace decisions shows how to use that history, and facility asset management shows how equipment records fit together.

Questions teams ask about spare parts

How many spares are enough?

Enough to cover the wait for a replacement on the equipment you cannot do without. There is no single number. Review the level after each stock-out.

Should we keep parts for equipment we plan to replace?

Only for as long as the equipment runs. Ask whether replacement should come sooner, and retire the spares when the equipment goes.

Who should be allowed to take parts?

Give each storeroom one owner. Anyone else who takes a part records it on a work order or a sign-out sheet.

Does a small building need a storeroom?

A shelf and a list is a storeroom. Begin with the few items you buy again and again, such as filters, belts and lamps, and add critical spares as your asset list shows them.

See parts and work orders together

Walk through stock, work orders and asset records on your own equipment.