Skip to content
Menu

Facility maintenance in Utah

Utah inspects boilers every year and elevators every two years under its 2024 construction codes. Salt Lake City adds 51.9 inches of snow and 94.0°F July highs.

Utah at a glance

  • 1,102Public schoolsStatewide
  • 162School districtsStatewide
  • 8Public collegesStatewide
  • 51.9inNormal snowfallSalt Lake area
  • 94.0°FJuly highSalt Lake area
  • 5,154Heating deg. daysSalt Lake area

What Utah's climate does to buildings

Salt Lake City normals pair hot, dry summers with snowy winters, so cooling work and snow removal both need room in the yearly budget.

Salt Lake City and the Wasatch Front

Nearly fifty-two inches of snow

Salt Lake City averages 51.9 inches of snow a year, with 12.7 inches in January and 12.1 in December. Keep roof snow checks and plowing contracts in place all winter.

Hot, dry Julys

July averages a 94.0°F high and only 0.49 inches of precipitation. Check rooftop units, cooling towers and irrigation before summer arrives.

April is the wettest month

Precipitation totals just 15.52 inches a year, and April brings the most at 2.16 inches. Clear roof drains as snowmelt and spring storms arrive together.

More heating than cooling

A normal year has 5,154 heating degree days and 1,420 cooling degree days, with January lows near 24.2°F. Boiler work stays the larger seasonal job.

A maintenance year in Utah

  1. JanCheck roof snow loads and drains after storms
  2. FebConfirm boiler internal inspections stay within 14 months
  3. MarBook elevator and escalator inspections coming due
  4. AprClear roof drains for snowmelt and spring rain
  5. MayStart irrigation and check backflow devices
  6. JunService rooftop units and cooling towers before heat peaks
  7. JulWater landscapes early and watch cooling loads
  8. AugFinish roof and paving work before fall
  9. SepReview code updates with designers before new projects
  10. OctStart boilers and test low water cutoffs
  11. NovLine up plowing and roof snow removal crews
  12. DecWatch roof snow loads through December storms

Codes and inspections in Utah

RuleWho inspects or enforcesHow often
BoilersDivision of Boiler and Elevator Safety or a deputized inspectorEvery year, inside and out
Internal boiler inspectionsDivision or deputized inspectorsNo more than 14 months apart; 30 for large power
Low pressure boilersDivision or deputized inspectorsAt least every two years
Insurance company inspectionsDeputized insurance inspectorReport filed within 30 days
Elevators and escalatorsDivision inspectors; owner pays the feesEvery two years, or more often
State construction codeApplies statewide, with state amendments2024 IBC, plumbing, mechanical and fuel gas codes
Energy and electrical codesApplies statewide2024 IECC and 2023 National Electrical Code
Workplace safetyUtah State PlanPrivate sector plus state and local government workers

Rules and funding by type of organization

Government and public works

Public employers under the state plan

Utah's State Plan covers state and local government workers along with the private sector. City shops, water plants and county buildings follow the same safety rules as private employers.

Find your type of organization

What to do this year

  1. Track each boiler's internal inspection so none passes 14 months.Recurring inspections
  2. Note every elevator certificate's two-year expiry and book inspections ahead of it.Life-safety equipment checks
  3. Plan snow removal and roof checks around a 51.9-inch winter.Preventive maintenance plan
  4. Build a capital plan from condition data before code-driven upgrades.Capital planning
  5. And much more. Let myFacilities build your custom to-do list, so you can plan, maintain and budget for your facilities with confidence.Book a call

Questions about Facilities Management in Utah

How often are boilers inspected in Utah?

Every year, inside and out, while not under pressure. Internal inspections may be no more than 14 months apart, or 30 months for a large power boiler. Low pressure boilers are inspected at least every two years.

How often are elevators inspected in Utah?

Every two years, or more often if the division decides it is needed. The inspection certificate expires two years after it is issued, and the owner pays the inspection and certificate fees.

Which building codes apply in Utah?

Utah applies the 2024 International Building Code with Appendices C and J, plus the 2024 IECC and the 2023 National Electrical Code, with state amendments.

Can an insurance inspector check a Utah boiler?

Yes. A deputized insurance company inspector may do it if the report reaches the division within 30 days. The boiler then owes no state inspection fee. The division can still suspend the certificate of an unsafe boiler.

Every inspection and repair in Utah, planned in one place.

See how inspection dates, preventive maintenance and capital plans work together.

Summaries of public rules, not legal advice. Check with the agency named.

Sources
  1. Common Core of Data, Table 2: operating public schools and districts by state, school year 2022-23, nces.ed.gov
  2. Digest of Education Statistics, Table 317.20: degree-granting postsecondary institutions by control and state, 2022-23, nces.ed.gov
  3. Utah Code 34A-7-103: Inspection requirements, inspection certificate, standards of inspectors, le.utah.gov
  4. Utah Code 34A-7-203: Requirements for operating an elevator or escalator, le.utah.gov
  5. Utah Code 15A-2-103: Specific editions adopted of construction code, le.utah.gov
  6. OSHA: Utah State Plan, osha.gov
  7. NWS Salt Lake City NOWData: monthly climate normals 1991-2020, Salt Lake City International Airport, weather.gov