Staff time at sports and recreation venues
Where venue crew time goes, between changeovers, ice and fields
At a venue, the event calendar decides the week. Crews flip floors, groom ice, line fields and train seasonal workers, and repairs squeeze into whatever is left. Counting the hours by kind shows which of them could be planned.
In short
- Venue time follows the event calendar: changeovers, ice and field preparation, and repairs made while visitors are in the building take most of an in-season week.
- Seasonal and part-time workers add hours of training and direction that rarely appear on any report.
- Measure one event-heavy week and one quiet one, by kind of time, then move event-day repairs into a walk-through before doors open.
- In myFacilities, every venue's requests, checklists and time on tasks sit in one record, filtered by venue, category or technician.
Why the event calendar owns the week
An arena may host a hockey game, a concert and a youth tournament in four days. Each changeover moves boards, flooring, seating and stages against a hard start time. Repairs that come up between events wait, or happen at overtime rates after the last spectators leave.
Outdoor venues and parks follow the weather instead: mowing and lining in spring, pools in summer, irrigation shutdown in fall, snow and ice in winter. Either way, planned work gets whatever the calendar leaves.
Seven kinds of venue crew time
Changeovers
Floors, boards, bleachers, seating sections, stages and the cleanup after each event.
Ice and fields
Resurfacing, edging, painting lines, turf grooming, mowing and irrigation.
Event-time repairs
Seats, lights, restrooms, doors and concessions fixed with the crowd in the building.
Planned work
Ice plant, pool pumps and filters, field lighting, scoreboards and HVAC.
Safety checks
Playground inspections, pool drain covers and water chemistry, bleacher walks.
Seasonal staff
Hiring, training and directing part-time workers through each season.
Waiting
For a late load-out, another crew, a part or the lift.
Two federal references add planned hours. Publication 325, the CPSC's handbook for public playgrounds, covers their inspection and maintenance. The Virginia Graeme Baker Act sets the drain cover rules for public pools. Give both their own checklists and count them as planned work.
Measure an event week and a quiet week
- Pick the weeksOne week with three or more events and one with none. For parks, pick a week in peak season.
- Total the time on work ordersChangeovers, ice and field work, and repairs, each in its own category.
- Count seasonal hours apartNote training and supervision separately from the work seasonal staff do.
- Log the waitsLate load-outs and crews waiting on each other are a large hidden block on event days.
- Line the hours up with the calendarPut them beside the event list, so you can see what each kind of event costs in crew time.
Example: one event week at a multipurpose arena
Made-up numbers for an arena with one ice sheet and outdoor fields, eight full-time and four part-time crew members; use your own.
- Paid hours (8 × 40 + 4 × 20)400
- Event changeovers96
- Ice resurfacing and ice care60
- Field and grounds preparation54
- Planned preventive maintenance44
- Repairs during and after events62
- Playground and pool checks24
- Training and directing seasonal workers30
- Waiting on load-outs, parts or other crews30
- Event-time repairs this week31
- Repairs a walk-through before doors open would have caught (one in three)10
- Hours each takes during an event2.0
- Hours each takes on the walk-through0.8
- Hours freed (10 × 1.2)12
Twelve hours in an event week is more than a full day's work for one crew member, recovered without overtime.
Changes that give a venue crew hours back
- Walk before every eventSeats, lights, restrooms, doors and concessions on one checklist, a few hours before doors open.
- Write each changeover down onceCrew size, order of steps and equipment for each conversion. Time it, then improve it.
- Keep parts where events happenSeat parts, lamps, flush valves and hardware stocked at the venue, not across town.
- Save big jobs for the off-seasonIce plant, pool and field lighting work goes into weeks with no events.
- Train seasonal workers with checklistsA short written list per task cuts the questions on every shift.
How myFacilities keeps crews and records together
The walk-through on a phone
Build the walk-through as a checklist. Anything found is reported from the same phone with a photo, so it reaches the right person before doors open.
Requests from the concourse
Staff report from any phone or by scanning a QR sticker at a seating section or restroom, so the crew knows exactly where to go.
Time by category
Each task's time is tracked on the phone as the crew works. Sort closed work by venue, category or technician to see what changeovers really cost.
Rentals in the same account
Public request forms for fields, gyms and rooms come with pricing and approvals, and sit beside the maintenance records.
Try the tools
- Maintenance backlog calculator: count the crew-weeks of repairs waiting for the off-season.
- Facility rental revenue calculator: see what booked field and rink hours bring in beside the crew time they use.
Questions venue teams ask us
Short answers about where crew hours go at venues and parks.
How do we count changeover time when the whole crew works it?
Record each changeover as one work order with the crew's total time, and give it a category by event type. After a season, you will know what a concert-to-hockey flip really costs, and can price or schedule events with that in mind.
Should ice resurfacing count as maintenance?
Count it as its own kind of time. Resurfacing and ice care are operations work, but they take the same crew's hours, so leaving them out makes maintenance look better staffed than it is.
How do we track hours for seasonal workers?
Separate the work they do from the time spent training and directing them. If direction keeps growing each season, written checklists and a short orientation usually pay back quickly.
What if events keep pushing planned work out?
Book planned work into the calendar like an event. A fixed weekly block, even a short one, protects ice plant, pool and lighting work from being bumped again.
More for venue and park teams
Guides and tools for stadiums, arenas, parks and recreation centers.
Run the event calendar without losing the crew.
See how walk-through checklists, requests and time on tasks work for a sports and recreation organization.