Free tool for school leaders
Equipment life expectancy calculator: when is it due?
Find the likely replacement year for a school's roof, boiler, rooftop unit or other major system, using a published useful life table or your own figure.
Find a replacement year
Choose a type of equipment or type your own expected life, then add the year it was installed.
For other types of buildings, use the equipment life expectancy calculator for any building, with presets for other types of organization.
Replacement year
Your replacement year shows here
A rough rule of thumb: expected lives come from a federal housing-agency table, and real equipment can last longer or fail sooner.
Where the expected lives come fromU.S. Department of Housing and Urban Development (HUD), CNA e-Tool Estimated Useful Life Table (2017), https://www.hud.gov/sites/documents/eul_for_cna_e_tool.pdf, “Family” column. HUD made this table for capital needs assessments of multifamily housing, so for school buildings it is a rule of thumb.
Why expected life matters for school budgets
Every roof, boiler and rooftop unit has a typical service life. Knowing roughly when each one is due lets a district spread replacements across years, line them up with bond and budget cycles, and avoid paying emergency prices when something fails in January.
The replacement year is simply the install year plus the expected life. The useful part is doing it for every major system in every school, so the big years show up early.
Expected useful life by equipment type
These figures come from HUD's useful life table for capital needs assessments. HUD wrote it for multifamily housing, not schools, so treat each number as a rule of thumb. School buildings are used on a different schedule from housing, and a well-maintained system can outlast its figure.
| Equipment or system | Years | HUD row |
|---|---|---|
| Roof: built-up with gravel (low slope) | 20 | 3.3.4.2.1 (p. 8) |
| Roof: EPDM rubber membrane (low slope) | 15 | 3.3.4.2.3 (p. 8) |
| Roof: TPO or vinyl membrane (low slope) | 15 | 3.3.4.2.4 (p. 8) |
| Roof: metal (sloped) | 50 | 3.3.4.1.2 (p. 8) |
| Roof: asphalt shingle (sloped) | 20 | 3.3.4.1.1 (p. 8) |
| Windows: aluminum | 35 | 3.3.3.2.3 (p. 8) |
| Boiler: gas-fired, sectional | 25 | 3.4.1.2.9 (p. 10) |
| Boiler: oil, gas or dual fuel, high capacity | 40 | 3.4.1.2.11 (p. 10) |
| Chilling plant | 20 | 3.4.2.1.17 (p. 11) |
| Cooling tower | 25 | 3.4.2.1.16 (p. 11) |
| Packaged rooftop HVAC unit | 15 | 3.4.3.1.11 (p. 13) |
| AC or heat-pump condenser | 15 | 3.4.3.1.1 and 3.4.3.1.2 (p. 12) |
| Gas furnace or air handler | 20 | 3.4.3.1.4 (p. 12) |
| Fan coil unit, hydronic | 30 | 3.4.2.2.11 (p. 12) |
| Circulating pumps (hot or chilled water) | 20 | 3.4.2.2.8 (p. 12) |
| Electrical switchgear | 50 | 3.5.1.1 (p. 14) |
| Interior lighting, common areas | 25 | 3.4.4.3.3 (p. 14) |
| Elevator machinery | 20 | 3.5.1.6 (p. 14) |
| Fire sprinklers and standpipes | 50 | 3.6.1.1 (p. 14) |
| Fire alarm central panel | 15 | 3.6.2.7 (p. 15) |
| Emergency generator | 25 | 3.2.8.2.4 (p. 3) |
| Playground equipment | 10 | 3.2.7.4 (p. 3) |
| Asphalt paving | 25 | 3.2.4.1 (p. 1) |
| Resilient or vinyl flooring | 15 | 3.7.1.1.10 (p. 16) |
| Carpet | 6 | 3.7.1.1.11 (p. 16) |
How to use a replacement year
- Start with what fails hardestRoofs, boilers, chillers, rooftop units and fire alarm panels: anything that would close a classroom.
- Use your own life when you have itManufacturer data, warranty terms and your own repair history beat any table.
- Look at condition, not just ageAn old unit in good shape can wait; a young one that keeps failing may not.
- Put the years into the capital planGroup replacements by year and school so funding can be planned ahead.
Read our guide to capital and bond planning and our guide to preventive maintenance.
The limits of a life table
- Housing, not schools. The table was written for multifamily housing.
- Averages. Climate, hours of use, installation quality and maintenance all move the real number.
- Not every type is listed. If yours isn't, type your own expected life.
How myFacilities tracks equipment life
These myFacilities tools do this for every asset in every school, and keep it current.
Asset Center
Every asset in one register, by school, building and room, with its install date, condition, history and expected life. About Facility Asset Management.
SMART™ Forecasting
Turns those install dates and expected lives into a multi-year plan of replacements and costs for every school. About SMART™.
iFCA™ condition assessment
Inspections on a phone record condition, so the plan reflects how equipment is really holding up, not only its age. About FCI.
Questions about equipment life
Short answers for school leaders and board members.
How is the replacement year worked out?
Install year plus expected life. Years left is the replacement year minus this year, from your device's clock.
Where do the expected lives come from?
From HUD's CNA e-Tool Estimated Useful Life Table (2017), Family column. It is a federal housing-agency table, so for schools it is a rule of thumb.
Can I use my own expected life?
Yes. Type any number of years in the expected life field, with or without choosing a type.
What if the equipment is past its expected life?
The calculator says how many years past it is. That doesn't mean it must be replaced today: check its condition and repair history, and plan the replacement before it fails.
Is anything I type saved or sent?
No. The calculator runs only in your browser. Nothing is sent, saved or tracked, and closing the page clears it.
Keep reading
Guides and product pages for school facilities teams.
See every replacement year for every school.
If you would like to see how myFacilities plans replacements from your own asset records, we are happy to show you.
Pick a time and we walk you through a sample school district.