Facilities staff time in local government

Where public works facilities time goes, between sites, requests and callouts

A city or county building crew covers libraries, community centers, offices, garages and pump stations spread across the map. Before asking for another position at budget time, show where today's hours go and which changes would give some back.

In short

  • A small crew serving many buildings loses a large share of its week to driving, to resident and council requests that need a reply, and to after-hours callouts.
  • Measure one ordinary week and one busy one, by kind of time, from work orders plus a brief log of driving, setups and waiting.
  • Hours by kind make a stronger budget request than a list of complaints, and they show the time that condition assessments and accessibility work really need.
  • In myFacilities, requests arrive with the facility filled in, the phone tracks time on each task, and reports split the hours by facility, category or technician.

Why a public works crew never catches up

Local government buildings are many, small and far apart. A crew of six may answer for forty facilities, from city hall and the council chambers to a branch library, a senior center and a lift station at the edge of town. Every trip costs time before a tool leaves the truck.

Requests come from every direction: department heads, residents using a building, a council member who heard about a broken door. Each needs an answer as well as a repair, and the answer is part of the job.

Eight kinds of crew time

  • Repairs on request. Doors, locks, plumbing, lighting, roof leaks and comfort complaints.
  • Planned preventive maintenance. Boilers, rooftop units, generators, fire systems and elevators.
  • Driving. Yard to facility, facility to supplier, and back again.
  • After-hours callouts. Alarms, heating failures, a flooded basement at a recreation center.
  • Setups. Council meetings, public hearings, elections and community events.
  • Inspections. Condition checks and accessibility walks for the ADA transition plan.
  • Paperwork. Purchase requests, quotes and figures for the budget office.
  • Waiting. For a vendor, a key holder or a part on a purchase order.

Measure one crew over a fortnight

  1. Pick two weeksOne ordinary week and one with a council meeting, an election or a cold snap. Note which is which.
  2. Start from work ordersTotal the time recorded on each closed order by facility and by category.
  3. Log what orders missEach crew member notes driving, waiting and setups in quarter hours, on a card or a phone.
  4. Count callouts apartRecord the hour, the facility and whether a planned check could have caught the problem.
  5. Reconcile with payrollCompare the total with paid hours, overtime included, so nothing goes missing.

What the numbers say at budget time

When driving passes a sixth of paid hours, routes are the first fix, not headcount. When callouts keep returning to the same pump station or boiler, that asset needs a planned check, a repair plan or a place in the capital improvement program.

Example: one week for a six-person building crew. Made-up numbers for 38 facilities; replace them with your own.

  • Paid hours before overtime (6 × 40)240
  • Repairs on request78
  • Planned preventive maintenance52
  • Driving between facilities46
  • Setups for meetings, elections and events18
  • Daytime follow-up on night callouts14
  • Inspections and condition checks12
  • Paperwork and request intake12
  • Waiting on vendors or parts8
  • Repair trips this week52
  • Trips folded into planned visits by area (about one in three)18
  • Driving saved per folded trip, hours0.5
  • Hours freed each week (18 × 0.5)9
  • Hours freed over 48 working weeks (9 × 48)432

That is about a fifth of a full-time position, found without hiring, and it can go to the preventive maintenance the condition reports keep asking for.

Changes that give a public works crew hours back

  1. Route by areaGroup facilities into areas and give each one a day, so non-urgent repairs ride along with planned visits.
  2. Load the trucks from the recordsCarry the filters, lamps, flush valves and door hardware your work history shows you use most.
  3. Answer requesters without a callA status link tells department heads, council offices and the public where a job stands.
  4. Treat setups as workCouncil, election and event setups come in as requests with a lead time and their own category.
  5. Plan the required checksIf your agency uses the modified approach of GASB Statement No. 34, condition assessments are due at least every three years. Accessibility work in a transition plan under 28 CFR 35.150(d) needs crew hours too. Book both as planned work.

Where myFacilities saves the crew a trip

The facility comes with the request

Staff report from a phone or by scanning the QR sticker in a room, with no account needed, so the crew knows where to go before leaving the yard.

Night calls reach the person on duty

Auto Assign rules choose who gets each request by site, category or time of day. An alarm at 2 a.m. goes to the on-call worker, not a daytime inbox.

Time recorded at the job

The phone tracks time on each task, with photos and notes, and planned visits arrive as work orders when their plans come due.

Hours by facility

Reports break closed work down by site, category, technician or cost, ready to export for the budget office.

Try the tools

Questions public works teams ask us

Short answers about where a building crew's hours go.

How do we show the city council where crew time goes?

Bring hours by kind, not anecdotes: repairs, planned work, driving, setups, callouts and waiting, for two measured weeks. Pair them with the open backlog and the condition of the buildings, and the request explains itself.

Should after-hours callouts be in the count?

Yes, as their own line. Record each one with the facility and the cause. Callouts that repeat at the same site are the clearest case for a planned check or a capital improvement project.

Does fleet and snow work belong in the same count?

Only if the same people do it. Many agencies share staff between buildings, fleet and plowing in winter. Count those hours by category, so a snowy month is not mistaken for a slow one.

How do GASB condition assessments fit into staff time?

If your agency reports infrastructure under the modified approach, the assessments are recurring work with a deadline. Schedule them as planned work and record the hours, so they are budgeted rather than squeezed between repairs.

More for public works teams

Guides and tools for cities, counties and public works departments.

Spend crew hours on the work, not the road.

See how requests, routing and time on tasks work for a public works crew.