How to write a work order a technician can act on
A vague work order can mean a second trip. Say where, what, how to get in, what to bring and what done looks like.
"AC not working, room 12." A technician reads that line and has questions. Which building? Not cooling, or not running? Is anyone in the room? Is there a key? The work order is the only briefing the technician gets before walking out the door. Writing it well takes little time. Writing it badly can mean a second trip.
In short
- Name the place the way people say it, and the asset the way the record names it.
- Describe what someone sees and hears, and when it happens, and leave the diagnosis to the technician.
- Add access and safety notes, and the parts the technician should bring.
- Say what done means and who confirms it, so the job can close cleanly.
Place and asset
Start with where. Give the building, the floor and the room as they appear on signs, and add the name people use, such as the north gym or the board room. For equipment above a ceiling or on a roof, say where: above the corridor outside the room, or the third unit from the roof hatch.
Then name the asset. Use the tag or the nameplate number if there is one. If two similar units sit side by side, say which. If the asset has no record yet, add a photo of the nameplate so someone can create one afterward.
| Weak | Better |
|---|---|
| Light out in hall | Corridor light, east wing, second floor, third fixture from the stairs |
| Pump noisy | Chilled water pump 2, basement plant room, grinding noise since Monday |
| AC broken | Meeting room 12, ceiling unit over the table, blowing warm air since this morning |
State the problem, not the guess
A good problem statement answers four questions. What is the symptom? When does it happen, and how often? What changed just before it started? Who is affected, and can the space or the machine still be used?
A work order should describe what someone saw and heard, and leave the diagnosis to the person who will fix it.
"Needs a new compressor" may be wrong, and it sends the technician to the wrong parts. "Unit runs but the room stays warm, and ice on the pipe near the unit" points to the cause without naming it. Put one problem on each work order. If a report holds two, split it into two, so each can be assigned, finished and checked on its own.
State the priority in words that mean something: a safety risk, a stopped operation, a disruption or a comfort issue. Add a name to call for questions. A work order is not an emergency line. For fire, injury, a gas smell or immediate danger, call emergency services first, then enter the work order.
Access and safety notes
Tell the technician how to get in. Name the key or badge needed, the hours the space is open and whether the room is occupied. Say if an escort is needed, where to park or unload, and who to call on arrival. If the job needs a ladder, a lift or roof access, say so before the technician leaves the shop.
Add known hazards: a wet floor, a sharp edge, a nesting animal, stored chemicals, a locked electrical room. Any job that needs equipment shut off or locked out follows your own safety program and the manufacturer's instructions, and only trained, authorized people do it. Roofs, ladders, electrical panels and chemicals follow the manufacturer, your local codes or authorities and your insurer. A work order should name who may do the work, and not ask someone to improvise.
If the work is noisy or disruptive, say who must be told first.
Parts, photos and what done means
List the parts you know about: the filter size, the belt, the part number on the nameplate, and what was replaced last time. Flag anything slow to arrive so someone can order early. In myFacilities, parts are tracked in stock and used on work orders. Our post on the work order process shows where parts fit in the closing record.
Attach photos: a wide shot for context, a close-up of the problem and the nameplate. In myFacilities, technicians see their day, update work orders and add photos from their phone, so the same photo habit works while the job is open and when it closes.
Figure What a useful work order holds
- WhereThe building, room and asset, in the words people use and the names the record uses.
- WhatThe symptom, when it happens and who it affects.
- Getting inKeys, hours, hazards and who to call on arrival.
- BringThe parts, tools and photos that spare the technician a guess.
- DoneWhat fixed looks like and who confirms it.
Finally, define done. A job is done when the symptom is gone and someone has checked it. Name that person: the requester, a supervisor or a lead. At the close, record what was found, what was done, the parts used and a photo of the finished work. If the technician finds a second problem, finish the first, and write the second as a new work order.
Clear closing notes build a history that is worth searching. When an organization turns it on, Facilibot™, our custom-built AI engine, finds similar past fixes, and people make the final decisions. See work order management for how requests move once they are in, and our post on building an asset inventory for how the asset names get consistent.
Questions teams ask about writing work orders
How much detail is too much?
Enough that a technician who has never seen the problem can start. Skip the history of the building and your opinions. Put long background in a note or a document.
Who should write the work order, the requester or the coordinator?
The requester describes what they see, in their own words. The coordinator adds the asset, the access notes and the parts, because the coordinator knows the building.
Should a photo be required?
Ask for one when it helps, such as a photo of the problem and the nameplate. Do not block an urgent report because a photo is missing.
What if the technician finds something different?
Record what was found. Finish the original problem if it is safe to do so, and write the new problem as a separate work order.